Kari校园教育体育休闲中心,芬兰 / Verstas Architects

2025-04-29 16:42:50建筑设计文化体育教育建筑 现代风格
项目标签

位于芬兰Rauma市的Kari校园将多座重要的公共机构与设施汇聚于一体,涵盖游泳馆、体育馆、综合学校、音乐学校、成人教育中心和青少年中心。多功能共存带来了显著的协同效应与成本节约。

 

The Kari Campus in Rauma gathers several important public institutions and amenities under one roof. It consists of swimming and sports halls, a comprehensive school, a music school, an adult education centre and a youth centre. Being together creates significant synergy and savings.

 

▼户外体育场一侧鸟瞰,half-aerial view of the sport field side

 

 

▼项目概览,overall of the project

 

 

▼外观夜景,night view

 

 

▼入口,entrance

 

 

▼外观细部,exterior view

 

 

Rauma是芬兰一座独特的城市,其市中心因珍贵且保存完好的传统木质城镇风貌,被列入联合国教科文组织世界遗产名录。Kari校园位于老城旁,新校园的小尺度体量与木质立面与老城形成了对话与呼应。

 

Rauma is a particular town in Finland. Its centre is listed UNESCO World Heritage because of its cherished and well-preserved traditional wooden townscape. The campus sits by the old town, with which the small-scale massing and wooden facades of the new campus are in dialogue.

 

▼立面,facade

 

 

▼餐厅,canteen

 

 

▼细部,details

 

 

教育、体育与休闲中心的核心区域是一个由服务台、大堂、咖啡馆和餐厅组成的中庭空间。围绕中庭布置了共享与专用的教学、表演和运动空间。建筑群的布局创造了阳光充足、气候宜人的室外活动区域。一个缓缓上升的入口广场引导访客步入建筑。庭院为不同年龄群体提供了丰富的游戏、运动、学习、交流与休闲的空间可能。游泳馆设有大面积窗户,可眺望绿意盎然的丘陵公园景观。

 

At the heart of the education, sports and leisure centre is an atrium of service desks, foyers, a café and a restaurant. Shared and dedicated spaces of teaching, performance and sports are around the central spaces are. The positioning of the building complex creates sunny outdoor areas that have a pleasant microclimate. A gently sloping entrance square welcomes visitors to the building. The yard has diverse possibilities of play, sports, learning, meeting and leisure for various age groups. The ample windows of the swimming hall open to a verdant hilly park.

 

▼休闲区域,leisure area

 

 

▼体育馆,sports hall

 

 

▼报告厅,auditorium

 

 

▼总平面图,master plan

 

 

▼平面图,plan

 

 

▼剖面图,section

 

 

Occupants: The new building consists of of swimming and sports halls, a comprehensive school, a music school, an adult education centre and a youth centre.

 

Location: Aittakarinkatu 10, Rauma, Finland

 

Client: City of Rauma

 

Opening: Sports halls, comprehensive school, music school, adult education centre and youth centre

 

August 2024

 

Swimming halls – March 2025

 

Architect & interior architect: Verstas Architects, Helsinki, Finland

 

Lead Architects- Jussi Palva (Partner-in-Charge), Väinö Nikkilä, Riina Palva and Ilkka Salminen

 

Project Manager – Sari Kukkasniemi & Pasi Piironen

 

Architecture Team

 

Atte Mattila, Kristina Färm, Anniina Taivainen, Tino Toivonen, Mikko Rossi, Santeri Hänninen, Pipsa Klang, Aino Airas, Otto Autio, Mika Lundberg, Ville Nurkka, Irma Verhe, Carl von Numers, Anna Nirkkonen, Ilkka Törmä, Pekka Airaxin, Jenni Salomaa

 

Interior Architecture Team

 

Laura Brotherus, Jessica Högsten, Johanna Ruusu, Karola Sahi, Elina Vähäkylä, Nina Sandell Collaborators – Swimming hall design – Arkkitehtuuritoimisto Arktes Oy

 

Landscape design- Masu Planning Oy

 

Pedagogical design – Arkkitehtuuritoimisto Finpeda Ltd

 

Structural engineering – Sweco Talotekniikka Oy

 

Acoustical engineering – A-Insinöörit Suunnittelu Oy

 

HVAC & sprinkler engineering – Sweco Talotekniikka Oy

 

Automation and water processing engineering Ramboll Finland Oy

 

Electrical engineering – Rejlers Oy

 

Geological engineering – Geobotnia Oy

 

Fire safety engineering – KK-Palokonsultti Oy

 

Infrastuctural engineering – Sweco Ympäristö Oy

 

Energy engineering – Granlund Consulting Oy

 

BIM coordinator – Tietoa Finland Oy

 

Cost control – Granlund Consulting

 

Geotechnical surveys – Ramboll Finland Oy

 

Main contractor- Hartela Länsi-Suomi Oy

 

Project cost – Approximately EUR 75 000 000

 

Dimensions and figures

 

Total gross floor area- 30 400 m

 

Sports hall – 4 600 m , 1 500 m , capacity 832 seats

 

Concert hall- Capacity 200 seats

 

Swimming hall- 6 700 m , pool surface 1 020 m

 

Project timeline

 

Design – Design started in the Fall 2018

 

Construction

 

The building ground excavation work was completed in January 2021 The construction kickoff was in June 2021

 

The construction completed (excluding the swimming hall) in April 2024 Swimming hall completion December 2024