Central Park办公楼,荷兰 / Group A

2025-12-08 16:38:50建筑设计办公会议办公建筑 现代风格
项目标签
项目地址

乌特勒支天际线中的绿色绿洲Green oasis in the skyline of Utrecht

 

GROUP A完成了位于活力四射的乌特勒支火车站区域的雕塑般的办公塔楼。90米高的Central Park 以标志城市45米线的亚热带公园命名。这个两层的室内公园被一个后退的玻璃立面所围绕,像波动的帷幕一样拥抱着公园。这里是员工们聚集在一起放松、头脑风暴或参加活动的地方,独特的生态系统俯瞰着这座城市。通过将室内公园作为建筑的核心特色,GROUP A 为这座城市的天际线增添了一座地标,并为绿色办公楼设立了新的标准。

 

GROUP A has completed the sculptural office tower centrally located in the vibrant Utrecht Station Area. The 90-meter-high Central Park is named after the subtropical park that marks the city’s 45 meter line. The two-story indoor park is enclosed by a receding glass facade embracing the park like an undulating curtain. This is where employees come together to unwind, brainstorm or attend an event in a unique ecosystem overlooking the city. By making the indoor park the building’s central feature, GROUP A adds a landmark to the city’s skyline and establishes a new standard for green office buildings.

 

▼项目鸟瞰,aerial view of the project

 

 

▼建筑主立面,main facade of the tower

 

 

▼与周围的建筑关系,tower among surrounding buildings

 

 

▼沿街视角,view from street

 

 

亚热带的会面场所Subtropical meeting place 

 

GROUP A通过绿色元素向城市致意,将员工的福祉置于办公环境的优先考虑位置。科学研究表明,植物对我们的身心健康有积极的影响。植物通过提供新鲜空气和减少压力,提高了工作场所的生产力。在11层和12层,半公共的郁郁葱葱的绿地公园配有工作区、会议中心和咖啡馆,提供了一种与办公环境截然不同的体验。一条木质甲板小道将你引导穿越公园,座椅区嵌入绿色植被中。由MOSS(可持续空间设计师)设计的绿色景观灵感来自亚速尔群岛的植物。花园中种植了50多棵树木和灌木,1500多株植物,甚至还有一条潺潺的小溪。

 

With a green gesture to the city GROUP A prioritizes wellbeing in the office environment. Scientific research has shown that plants have a positive effect on both our physical and mental condition. Plants increase productivity in the workplace by providing fresh air and reducing stress. On the 11th and 12th floor, the semipublic lush green park with workspace, meeting center and café offers an experience that contrasts with the office environment. A wooden deck path guides you through the park to seating areas embedded in green. The green design by MOSS (Makers of Sustainable Spaces) is inspired by flora of the Azores. The garden includes over 50 trees and shrubs, 1,500 plants and even a babbling stream.

 

▼室内公园与工作区,Indoor park and workspace

 

 

 

▼绿色走廊中的座椅区,Seating area in the green corridor

 

 

 

有机形态 Organic shapes 

 

微妙交替的立面网格与建筑的透明腰部形成鲜明对比,阳光充足地洒进公园。室内公园顶部和底部雕塑般设计的边缘跟随地形的起伏,从外部延伸到内部。根据植被布局的指引,12层的夹层围绕着独立的核心有机地展开,提供了室内公园和城市的全景视角。

 

The subtly alternating façade grid provides a compelling contrast to the transparent waist of the building flooding the park with daylight. The sculpturally designed edges at the top and bottom of the indoor park follow the undulations of the landscape and extend from the outside to the inside. Guided by the planting scheme, the 12th floor mezzanine organically unfolds around the freestanding core offering panoramic views of the indoor park and the city.

 

▼绿色夹层空间全景,Panoramic view of the green office area

 

 

 

▼绿植种植空间,Planting area

 

 

可持续与智能建筑Sustainable and smart building

 

在Central Park,可持续性不仅仅体现在室内公园上。这座23层高的建筑符合最高的可持续标准,获得BREEAM Excellent设计证书,并通过约1300平方米的灵活办公楼层,响应当前和未来的需求。智能技术与智能立面和光线传感器有助于创造愉悦的室内气候和用户舒适度。Central Park在能源消耗方面预计将达到“巴黎标准”,因此提前实现2050年巴黎气候目标中的能源中立。

 

▼立面图,elevation

 

 

In Central Park sustainability goes beyond the indoor park. The 23-storey building has the highest standards of sustainability with a BREEAM Excellent design certificate and responds to current and future demands with flexible office floors of around 1,300 sqm each. Smart technology with smart facades and light sensors contribute to a pleasant indoor climate and user comfort. Central Park is expected to be ‘Paris Proof’ in terms of energy consumption and thereby ahead of the Paris climate goals of achieving energy neutrality by 2050.

 

▼绿植办公区外立面,Exterior of green office area

 

 

 

嵌入在The Forum 中Embedded in The Forum

 

Central Par的双层高底层无缝连接The Forum,一个位于乌特勒支中央火车站周围的高架景观广场。凹进的公共基座包括办公大堂、商业空间和咖啡馆,沿着行走路径流畅延伸。与The Forum的大地色调材料相呼应,Central Park的铜色立面增添了温暖和优雅。随着与The Forum的平滑过渡,Central Park与乌特勒支中央火车站、中央商务区及市中心连接紧密。凭借其在荷兰中心的战略位置,Central Par交通便捷。

 

Central Park’s double-height ground floor connects seamlessly to The Forum, an elevated landscaped square around Utrecht Central Station. The recessed public plinth with office lobby, commercial space and café, follows the walking path in a fluid motion. In tune with The Forum’s earthy palette of materials, also designed by GROUP A, Central Park’s bronze-coloured façade adds warmth and elegance. With its smooth transition to The Forum, Central Park is well connected to Utrecht Central Station, Central Business District and the city centre. Due to its strategic location in the center of the Netherlands, Central Park is easily accessible.

 

▼与周围环境无缝衔接,Connects seamlessly to surrounding environment

 

 

▼建筑立面细节,details of facade

 

 

 

实现Realization

 

Central Park由Angelo Gordon和APF International开发,目前由Bouwinvest Office Fund所拥有。该建筑的设计通过一个整体设计过程完成,其中由承包商Bouwcombinatie Westflank Noord 领导的多学科设计团队,负责建筑的整体实现。GROUP A提供了建筑设计,Huygen提供了M&E工程设计,Van der Vorm提供了结构工程设计,Peutz提供了建筑物理咨询服务。MOSS Amsterdam负责室内公园的绿色设计,由Koninklijke Ginkel Groep执行。Central Park于2021年9月完成,预计将在2021年11月投入使用。

 

Central Park is a development by Angelo Gordon and APF International currently owned by Bouwinvest Office Fund. The building’s design was achieved in an integral design process, in which a multidisciplinary design team led by the contractor Bouwcombinatie Westflank Noord, took responsibility for the overall realization of the building. GROUP A provided the architectural design, Huygen the M&E engineering, Van der Vorm the structural engineering and Peutz the building physics consultancy. MOSS Amsterdam is responsible for the green design of the indoor park executed by Koninklijke Ginkel Groep. Central Park was completed in September 2021 and will be taken into use in November 2021.

 

▼夜览,Nightview

 

 

▼项目区位图,Site plan

 

 

▼办公室平面图,Office plan

 

 

▼绿植区平面图,Green area plan

 

 

 

▼细部节点,detail drawing

 

 

Project details

 

Project name: Central Park

 

Location: Stadsplateau 19-40, Utrecht, NL

 

Client: Angelo Gordon and APF International

 

Investor: Bouwinvest Dutch Institutional Office Fund

 

Project Manager: Peak Development

 

Architect: GROUP A

 

Team: Adam Visser, Chris Woltjes, Perry Klootwijk, Frank Deltrap, Gabrielius Varnelis, Laura Onnis, Edwin van Thuijl, Raymond Leentvaar,

 

Greetje van den Nouweland, Mindaugas Arlauskas, Jos Overmars, Kenny Kwong, Dichao Wang, Jing Lin, Luca Piattelli

 

Assignment: New Building | Offices and hospitality

 

Contractor: Bouwcombinatie Westflank Noord (collaboration of construction companies Wessels Zeist and Wessels Rijssen)

 

Structural engineer: Van der Vorm Engineering

 

Installation advisor: Huygen Installation Advisors

 

Building physics: Peutz BV

 

Brokers: Cushman & Wakefield and Ans de Wijn

 

Ceiling park inside: Curve Works

 

Ceiling park outside: CIG Architecture

 

Subcontractor park: Koninklijke Ginkel Groep

 

Green design: MOSS (Makers of Sustainable Spaces)

 

Area: 31,596 sqm

 

Meeting function: 3,223 sqm, of which 1,319 sqm is traffic space

 

Office function: 28,373 sqm, of which 11,607 sqm is traffic space

 

Start design: 2017

 

Start Construction: April 2019

 

Completion: September 2021 (casco)

 

Photography: Sebastian van Damme, Jordi Huisman

 

Sustainability: BREEAM design certificate Excellent