FC Lugano New Football Stadium, Switzerland/Cruz y Ortiz Arquitectos Giraudi Radczuweit Architetti

发布人: Giraudi Radczuweit Architetti浏览量:02026-11-06 16:45:59
Project Tags

Arena Sportiva足球场是卢加诺新体育与活动中心的重要组成部分之一。建筑以水平延展的姿态融入卡萨拉特山谷,大尺度的连续屋顶与通透的周边界面构成其鲜明特征,使球场与周围景观及公共空间保持视觉联系。

 

The Arena Sportiva is one of the key elements of the new Polo Sportivo e degli Eventi in Lugano. The stadium blends into the Cassarate Valley with its horizontal architecture, characterised by a large, continuous roof and a transparent perimeter that maintains a visual connection with the landscape and with the public space.

 

▼球场与周边城市环境,Stadium and its urban surroundings

 

 

▼球场与山谷的联系,Relationship between stadium and valley

 

 

▼从上方看球场内部,Elevated view into the stadium

 

 

▼街角的球场全景,Stadium viewed from the street corner

 

 

▼黄昏中的连续屋顶,Continuous roof at dusk

 

 

▼绿树掩映下的入口,Entrance framed by trees

 

 

▼与街道相接的透明界面,Transparent enclosure along the street

 

 

▼山谷中的球场,Stadium in the valley

 

 

看台从主入口标高向比赛场地逐级下沉,减轻了建筑的视觉体量。上层环形通道组织观众流线,使球场与外部环境始终保持联系。空间布局将观众、球员、媒体、工作人员、安保人员及贵宾区的流线分别组织。

 

▼项目最初概念剖面草图,Initial conceptual section

 

 

The stands slope down from the main entrance level towards the pitch, minimising their visual impact. An upper ring channels spectator flow and ensures that the connection between the pitch and the outside environment is maintained at all times. The layout allows for the separation of routes for spectators, players, the press, staff, security and VIP areas.

 

▼混凝土基座与通透上层,Concrete base and transparent upper level

 

 

▼观众沿楼梯进入球场

 

Spectators ascending the entrance stair

 

 

▼入口阶梯与街道,Entrance steps and street

 

 

▼面向街道的公共入口,Public entrance facing the street

 

 

▼场地与看台,Pitch and stands

 

 

▼比赛场地全景,Panoramic view of the pitch

 

 

▼暮色中的看台与屋顶,Stands and roof at dusk

 

 

球场可容纳约8,200名观众,同时也为其他使用方式与空间布置预留了适应性。

 

With a capacity of approximately 8,200 spectators, the stadium is designed to accommodate other uses and configurations as well.

 

▼比赛日的观众席,Spectators on match day

 

 

▼屋顶下的观赛视野,View of the match beneath the roof

 

 

▼球场内的开阔视野,Open view from inside the stadium

 

 

▼比赛中的球场,Stadium during a match

 

 

▼球员与观众,Players and spectators

 

 

▼比赛日的屋顶与看台,Roof and stands on match day

 

 

▼看台与外围景观,Stands and surrounding landscape

 

 

▼看台与山坡上的建筑,Stands and buildings on the hillside

 

 

▼看台立面与场地,Stand elevation and pitch

 

 

▼场地通向看台的视线,View across the pitch towards the stands

 

 

▼观众使用中的环形通道

 

Spectators using the perimeter concourse

 

 

▼透过通道看向绿树

 

Trees seen through the concourse

 

 

▼看台下方的通道

 

Circulation beneath the stands

 

 

建筑结构由混凝土基座、金属柱和金属屋顶共同构成,轻盈的围护界面进一步强化了整体的通透感。

 

▼贵宾看台剖面详图,VIP stand section detail

 

 

The structure combines a concrete base with metal columns and a metal roof, whilst the lightweight envelope enhances the transparency of the whole.

 

▼球场立面,Stadium facade

 

 

▼水平延展的外围立面,Horizontally extended perimeter facade

 

 

▼球场与日常街景,Stadium in the everyday streetscape

 

 

▼屋顶框景与远山,Roof framing the distant mountains

 

 

▼屋顶结构与座席,Roof structure and seating

 

 

▼场地、看台与远山,Pitch, stands and distant mountains

 

 

项目的能源策略包括高效节能的围护结构、利用卢加诺湖水的城市热交换网络、LED照明,以及与屋顶结合的大面积光伏系统。球场由此成为一个紧凑、灵活,并与所在城市环境紧密相连的建筑。

 

The energy strategy relies on an energy-efficient envelope, a connection to the urban heat exchange network using water from Lake Lugano, LED lighting and a large photovoltaic system integrated into the roof. The stadium is thus conceived as a compact, flexible structure closely linked to the urban context in which it is situated.

 

▼入夜后的球场外观,Exterior after nightfall

 

 

▼亮灯后的入口立面,Illuminated entrance facade

 

 

▼夜色中的街道界面,Street frontage at night

 

 

▼暮色中的球场鸟瞰,Aerial view at dusk

 

 

▼夜间照明下的球场,Stadium under night lighting

 

 

▼区位图,Site location plan

 

 

▼地下二层平面图,Basement level -2 plan

 

 

▼地下一层平面图,Basement level -1 plan

 

 

▼地面层平面图,Ground floor plan

 

 

▼地上二层平面图,First floor plan

 

 

▼屋顶平面图,Roof plan

 

 

▼东立面图,East elevation

 

 

▼西立面图,West elevation

 

 

▼南立面图,South elevation

 

 

▼北立面图,North elevation

 

 

▼横剖面图,Transverse section

 

 

▼纵剖面图,Longitudinal section

 

 

▼立面构造详图,facade detail

 

项目名称: FC Lugano新足球场

 

地点: Via Giacomo e Filippo Ciani 67,卢加诺,瑞士

 

地理坐标(原稿): 46°02′29.5″N 8°96′26.6″E

 

功能: 足球场

 

业主: Città di Lugano,Via della Posta 8 / Lugano, Switzerland;HRS Real Estate AG,Walzmühlestrasse 48 / Frauenfeld, Switzerland

 

使用方: Football Club Lugano;Città di Lugano

 

竞赛年份: 2013

 

设计与建造: 2019–2026

 

用地面积及观众容量(信息表原稿): 20.221 m² – 8.300 spectators

 

主建筑面积(原稿): 46.30 m²

 

建筑设计: Cruz y Ortiz Arquitectos SLP + Giraudi Radczuweit Architetti Sagl

 

CyO团队,塞维利亚: Antonio Cruz, Antonio Ortiz; Blanca Sánchez(项目负责人), Javier Monge, Pablo Boza, Sandro Massaro, Sergio Mota, Anabel Baños, Juan C. Luque, Rafael Pérez, Giordano Baly, Federico Curti, Liang Chen, Rocio Peinado, Barbara Santos, Juan C. Mulero

 

CyO团队,卢加诺: David de Cos(卢加诺负责人), Georgina Cavalli, Davide Locati

 

GR团队: Sandra Giraudi, Thomas Radczuweit; Massimo Frasson, Ludovico Pevere, Francis Blouin, Carlo Schwitter, Tommaso Facchini, Henrique Meili, Francesca Bigger, Elena Cerbone, Martino Colombo

 

结构工程: Fürst-Laffranchi Bauingenieure GmbH

 

机电及设备: VRT SA; Elettroconsulenze Solcà SA

 

消防顾问: Swiss Safety Center AG

 

建筑物理: Kopitsis Bauphysik AG

 

幕墙顾问: Neuschwander + Morf AG

 

室内设计: CBA Clemens Bachmann Architekten

 

摄影: Fernando Alda

 

Project: New FC Lugano Stadium

 

Location: Via Giacomo e Filippo Ciani 67 / Lugano, Switzerland

 

Geolocation (as supplied): 46°02′29.5″N 8°96′26.6″E

 

Program of uses: Football Stadium

 

Client: Città di Lugano, Via della Posta 8 / Lugano, Switzerland; HRS Real Estate AG, Walzmühlestrasse 48 / Frauenfeld, Switzerland

 

User: Football Club Lugano; Città di Lugano

 

Competition: 2013

 

Project design and construction: 2019–2026

 

Plot and spectators (project credits as supplied): 20.221 m² – 8.300 spectators

 

Main Building (as supplied): 46.30 m²

 

Architects: Cruz y Ortiz Arquitectos SLP + Giraudi Radczuweit Architetti Sagl

 

Team CyO, Seville: Antonio Cruz, Antonio Ortiz; Blanca Sánchez (Project Director), Javier Monge, Pablo Boza, Sandro Massaro, Sergio Mota, Anabel Baños, Juan C. Luque, Rafael Pérez, Giordano Baly, Federico Curti, Liang Chen, Rocio Peinado, Barbara Santos, Juan C. Mulero

 

Team CyO, Lugano: David de Cos (Lugano Director), Georgina Cavalli, Davide Locati

 

Team GR: Sandra Giraudi, Thomas Radczuweit; Massimo Frasson, Ludovico Pevere, Francis Blouin, Carlo Schwitter, Tommaso Facchini, Henrique Meili, Francesca Bigger, Elena Cerbone, Martino Colombo

 

Structural Engineering: Fürst-Laffranchi Bauingenieure GmbH

 

MEP / Facilities: VRT SA; Elettroconsulenze Solcà SA

 

Fire Safety Expert: Swiss Safety Center AG

 

Building Physics: Kopitsis Bauphysik AG

 

Façade Consultant: Neuschwander + Morf AG

 

Interior Design: CBA Clemens Bachmann Architekten

 

Photography: Fernando Alda

 

网站 / Website: www.cruzyortiz.com

 

邮箱 / Email: jcarlosmulero@cruzyortiz.com